Skip to content
RelySign in
← Back to atlas
federalUnited StatesSection 8 Project-Based Voucher Programphysical_inspection

At least 20 percent of contract units in each building must be inspected biennially, with full reinspection on a failure rate above 20 percent

pbv.inspection.periodic_sample · v1.0.0

At least biennially during the HAP contract term the PHA must inspect a random sample of at least 20 percent of the contract units in each building to determine whether the units and premises are maintained in accordance with HQS, or at least once every three years for a small rural PHA. If more than 20 percent of the sampled units in a building fail the initial inspection the PHA must reinspect 100 percent of the contract units in that building.

Confidence
high
Effective from
2024-06-06
Last reviewed
2026-08-22

Evidence required

  • NSPIRE inspection report(at_least_one)

Citations

All sources verified within 1 day
  • Project-Based Voucher Program
    983.103(e)(1)
    regulationSource ↗verified 1d ago
  • Project-Based Voucher Program
    983.103(e)(2)
    regulationSource ↗verified 1d ago
  • Project-Based Voucher Program
    983.103(i)
    regulationSource ↗verified 1d ago